In the state where the stone crusher is temporarily deactivated, it will bring a lot of trouble to the normal production in the future. In order to allow the equipment to work normally in the future, we need some maintenance on these grinding equipment during the long period of idle time.
First, for stone mills, they are basically made of iron and steel. Therefore, for these grinding equipments, the primary task is to prevent rusting of the equipment, and to re-treat the paint on the surface of the equipment. It is best to apply grease to the metal blades, cutting blades, fan blades and other parts inside the machine to ensure the quality.
Second, the storage location of the equipment should be appropriate. If possible, store the unit in a dry, ventilated room. If there are no conditions, choose a flat floor and put the board on it to prevent the grinding equipment from getting wet. At the same time, cover the equipment with a rain-proof cloth cover.
Third, the final inspection and cleaning of the stone crusher. Release the cooling water in the engine and replace the engine oil. The fuel tank equipment should be filled with diesel to prevent the tank from rusting.
评论
发表评论