Method of calculating cement ball mill capacity

Cement ball mill is commonly used crushing equipment in the industry ,the statistics on the output of the ball mill in actual production is an important basis for the report-type statistics of the production workshop. The data is mainly the statistics of the production of different shifts and the output of the ball mill, and we usually calculate the capacity of the mill. The basic methods are: the measuring method, the feeding weight measurement method, and the estimation of the output per ton of grinding body. Below, Dawning introduces you to the calculation of the specific yield of different methods.

1. Volume method
The bin method is one of the easiest methods for calculating the actual output of the ball mill. For the actual measurement, we take a simple weight measurement as an example, weigh a small iron drum of 1000 ml of water, and then we will Put the cement or raw material into it, tap it, smooth it, weigh it, then pour it out, fill it with water and weigh it again, then subtract the weight from the known weight to know the cement or raw The bulk density of the material, but this operation is only suitable for the production of a grinding bin, not for the production of more mills.

2.Feeding weight measurement
This kind of metering operation is limited by the various conditions of the ball mill production, and the obtained result can only be regarded as the approximate value of the ball mill production capacity. The specific application formula is
qR=feeding amount×C4
 qR is the amount of fine ore selected by the ball mill, the unit is t/h;
C4 is the content of the particles passing through the 0.08 mm square hole sieve in the material, and is measured in %.

3. Estimation of the output per ton of grinding body in the ball mill
The error of this method is relatively large and can only be used as a reference. According to the operating experience, the output of each medium-ton ball mill and raw material mill per ton of grinding body is 340-450 kg per hour, some In the case of 550 kg per hour, the cement ball mill can produce 300-400 kg per ton of grinding body per ton, and sometimes even 450 kg per hour.

However, as of now, there is no precise calculation method that can accurately calculate the specific output of the ball mill. You can decide which method to calculate the output based on the actual production situation.


Method of calculating cement ball mill capacity

评论

此博客中的热门博文

How to reduce the maintenance cost of the aluminum shredder

Contact Person:Mr.Zhao 0086-13523465141 With the increasing presence of  aluminum shredder  equipment in the market, how to maintain this equipment after a period of production, and how to reduce the cost of maintenance ,which are the user should know. After all, users have invested a lot of money in the purchase and use of the aluminum shredder equipment, so in order to get more profit, we need to do more to reduce more investment costs. The cost of repairs is also part of our cost.   Some users may say that we can not generate maintenance costs. This is impossible. As long as it is mechanical equipment, there will be some problems after using it for a period of time. We need to repair and maintain the equipment. These all require us to spend some money. If we want to reduce the cost in this area, we need to operate the equipment correctly in normal production and use, so that the equipment can reduce unnecessary damage. All we can do is to make the equipment on th...

How to deal with the heating problem of shredder motor

When we use the motor for a long time, there will be the problem of motor heating. The motor will lack of oil after a long time, which will affect the production efficiency of the whole shredder equipment . If the motor is hot or burnt, there is no way to tear it. How to avoid the phenomenon of motor heating of the shredder? 1. The adjustment of the tension of the V-belt of the shredder equipment, when the V-belt is too tight, the motor bearing heats up, when the V-belt is too loose, the rotation speed decreases, and the V-belt is easy to slide, which all affect the service life. When adjusting the tension of the V-belt, the bolt fixing the motor base can be loosened, and the position of the motor on the slide way can be changed with the adjusting bolt, so that the V-belt can reach the required tightness, and then the fixed bolt can be tightened; 2.After the shredder motor works for a certain period of time, it is necessary to add oil or open the cleaning bearing and refill the file ba...