Method of calculating cement ball mill capacity

Cement ball mill is commonly used crushing equipment in the industry ,the statistics on the output of the ball mill in actual production is an important basis for the report-type statistics of the production workshop. The data is mainly the statistics of the production of different shifts and the output of the ball mill, and we usually calculate the capacity of the mill. The basic methods are: the measuring method, the feeding weight measurement method, and the estimation of the output per ton of grinding body. Below, Dawning introduces you to the calculation of the specific yield of different methods.

1. Volume method
The bin method is one of the easiest methods for calculating the actual output of the ball mill. For the actual measurement, we take a simple weight measurement as an example, weigh a small iron drum of 1000 ml of water, and then we will Put the cement or raw material into it, tap it, smooth it, weigh it, then pour it out, fill it with water and weigh it again, then subtract the weight from the known weight to know the cement or raw The bulk density of the material, but this operation is only suitable for the production of a grinding bin, not for the production of more mills.

2.Feeding weight measurement
This kind of metering operation is limited by the various conditions of the ball mill production, and the obtained result can only be regarded as the approximate value of the ball mill production capacity. The specific application formula is
qR=feeding amount×C4
 qR is the amount of fine ore selected by the ball mill, the unit is t/h;
C4 is the content of the particles passing through the 0.08 mm square hole sieve in the material, and is measured in %.

3. Estimation of the output per ton of grinding body in the ball mill
The error of this method is relatively large and can only be used as a reference. According to the operating experience, the output of each medium-ton ball mill and raw material mill per ton of grinding body is 340-450 kg per hour, some In the case of 550 kg per hour, the cement ball mill can produce 300-400 kg per ton of grinding body per ton, and sometimes even 450 kg per hour.

However, as of now, there is no precise calculation method that can accurately calculate the specific output of the ball mill. You can decide which method to calculate the output based on the actual production situation.


Method of calculating cement ball mill capacity

评论

此博客中的热门博文

How much does it cost to invest in a calcium carbonate grinding mill

Contact Person:Mr.Zhao 0086-13523465141 Calcium carbonate grinding mill  is designed and manufactured for the grinding operation of calcium carbonate, a non-metallic stone material. The equipment has the characteristics of high screening rate, low energy consumption, energy saving and environmental protection, and is well received by users. Many users who pay attention to or invest in calcium carbonate grinding mill equipment will be more concerned about "how much is the price of investing in a calcium carbonate grinding mill equipment?" Because the investment itself needs to see the difference between the income and the investment cost. In fact, the price of investing in calcium carbonate grinding mill equipment depends on the model of the equipment you choose. The larger the model, the stronger the milling capacity, the higher the output value, the higher the cost of the production equipment, and the higher the price of the manufacturers. Zhengzhou Shuguang is a company...

Scrap metal shredder

Start up and operation steps of dual shaft shredder

The industrial shredder expert explains the steps of starting the dual shaft shredder: 1. The starting motor of the dual shaft shredder operates under no load. If the technical conditions of each part are normal, it can only operate under load after the rotating speed is normal. 2. During the operation of the dual shaft shredder, there shall be no magnetic jamming and friction sound. 3. The screen shall be installed firmly, sealed, without leakage, and the screen frame shall be fixed tightly. 4. In case of abnormal noise, blocked discharge, overheated bearing or motor during the operation of the dual shaft shredder, stop feeding, stop inspection and troubleshooting. 5. At the end of the work, the crusher and fan can be stopped only after the materials in the machine are completely removed. 6. Safety production must be strictly guaranteed during operation. Do not increase the speed of the dual shaft shredder at will. Check the cotter pin on the pin shaft frequently. If it is excessivel...