Method of calculating cement ball mill capacity

Cement ball mill is commonly used crushing equipment in the industry ,the statistics on the output of the ball mill in actual production is an important basis for the report-type statistics of the production workshop. The data is mainly the statistics of the production of different shifts and the output of the ball mill, and we usually calculate the capacity of the mill. The basic methods are: the measuring method, the feeding weight measurement method, and the estimation of the output per ton of grinding body. Below, Dawning introduces you to the calculation of the specific yield of different methods.

1. Volume method
The bin method is one of the easiest methods for calculating the actual output of the ball mill. For the actual measurement, we take a simple weight measurement as an example, weigh a small iron drum of 1000 ml of water, and then we will Put the cement or raw material into it, tap it, smooth it, weigh it, then pour it out, fill it with water and weigh it again, then subtract the weight from the known weight to know the cement or raw The bulk density of the material, but this operation is only suitable for the production of a grinding bin, not for the production of more mills.

2.Feeding weight measurement
This kind of metering operation is limited by the various conditions of the ball mill production, and the obtained result can only be regarded as the approximate value of the ball mill production capacity. The specific application formula is
qR=feeding amount×C4
 qR is the amount of fine ore selected by the ball mill, the unit is t/h;
C4 is the content of the particles passing through the 0.08 mm square hole sieve in the material, and is measured in %.

3. Estimation of the output per ton of grinding body in the ball mill
The error of this method is relatively large and can only be used as a reference. According to the operating experience, the output of each medium-ton ball mill and raw material mill per ton of grinding body is 340-450 kg per hour, some In the case of 550 kg per hour, the cement ball mill can produce 300-400 kg per ton of grinding body per ton, and sometimes even 450 kg per hour.

However, as of now, there is no precise calculation method that can accurately calculate the specific output of the ball mill. You can decide which method to calculate the output based on the actual production situation.


Method of calculating cement ball mill capacity

评论

此博客中的热门博文

What to do if the metal shredder discharges unevenly

 In the course of use, the metal shredder has uneven discharge. Through analysis, Shuguang heavy machinery summarized the following reasons. First of all, because the voltage is unstable, it will affect the stability of the motor, resulting in uneven speed, fast and slow and other problems, which will worsen the uneven discharge. When the feed is uneven, it is easy to block and cause the cavity to become clogged. Fully process unfinished materials. In severe cases, many blockages may cause downtime or increase in motor temperature.  Secondly, the motor is unstable. When the voltage is stable, following the change of the force endured by the transmission, the fixed point of the motor will be displaced and the base screw will be loosened.  Therefore, it is necessary to check whether this part is complete. First, the current professional standards for shredders are not standard, and the supporting shredder blade standards are also complicated. The shredder produced by the s...

How to Avoid Faults in Aluminum shredder

The main purpose of scrap  aluminum shredder  equipment is to tear all kinds of unqualified scrap iron into smaller pieces for recycling. Reduce the volume of unprocessed raw materials for mixing with other materials. How to avoid equipment failure in daily production of scrap aluminum shredder equipment?   1. Check and clean in time. After work every day, the machine should be cleaned in time. Check screw loosening and abrasion of easily worn parts such as claws, sieves, etc. http://www.sg-shredder.com/News/Industry_News/755.html

How to deal with the heating problem of shredder motor

When we use the motor for a long time, there will be the problem of motor heating. The motor will lack of oil after a long time, which will affect the production efficiency of the whole shredder equipment . If the motor is hot or burnt, there is no way to tear it. How to avoid the phenomenon of motor heating of the shredder? 1. The adjustment of the tension of the V-belt of the shredder equipment, when the V-belt is too tight, the motor bearing heats up, when the V-belt is too loose, the rotation speed decreases, and the V-belt is easy to slide, which all affect the service life. When adjusting the tension of the V-belt, the bolt fixing the motor base can be loosened, and the position of the motor on the slide way can be changed with the adjusting bolt, so that the V-belt can reach the required tightness, and then the fixed bolt can be tightened; 2.After the shredder motor works for a certain period of time, it is necessary to add oil or open the cleaning bearing and refill the file ba...