How to do the check work of calcium carbonate grinding mill

Contact Person:Mr.Zhao 0086-13523465141
For the calcium carbonate grinding mill, to ensure the ideal production,we need do the check work before the start-up.This inspection is to find out some factors that may cause equipment failure in time to ensure the smooth progress of production. At the time of inspection, there are mainly five aspects. Here is to analyze these aspects.
1. Lubrication
Before the start of the calcium carbonate grinding mill, the lubrication condition is checked to ensure sufficient lubrication. This is the premise to ensure the efficient operation of the equipment. If the lubrication is insufficient, the parts such as the grinding ring and the grinding ring in the equipment will be worn more. 
2. Firmware situation
The calcium carbonate grinding mill has some fasteners, which should be checked before starting the machine, such as bolts. If the bolts that fix the mill to the foundation loosen and are not found in time, then vibration will occur in the production. Such phenomena may even cause the machine to detach from the base, which is not only unfavorable to production, but also extremely harmful to the safety of workers.
3.Conveyor belt situation
The operation of the calcium carbonate grinding mill requires the assistance of the conveyor belt. It needs to be checked before starting the machine. If it is found to be damaged, it should be replaced immediately. If there is oil on the conveyor belt, wipe the oil with a rag.
 4.Protective device
This device is very important for the calcium carbonate grinding mill, and it is related to the safety problems in production. Therefore, it must be checked before starting the machine, and the abnormal phenomena should be solved in time to prevent accidents.
5. Grinding room
 Check the grinding chamber. If there is oil ore or debris, the operator should clean it up to ensure that the machine cavity starts.

http://www.sgzgchina.com/news/show-444.html

评论

此博客中的热门博文

Waste tire recycling line

Method of calculating cement ball mill capacity

Cement ball mill  is commonly used crushing equipment in the industry ,the statistics on the output of the ball mill in actual production is an important basis for the report-type statistics of the production workshop. The data is mainly the statistics of the production of different shifts and the output of the ball mill, and we usually calculate the capacity of the mill. The basic methods are: the measuring method, the feeding weight measurement method, and the estimation of the output per ton of grinding body. Below, Dawning introduces you to the calculation of the specific yield of different methods. 1. Volume method The bin method is one of the easiest methods for calculating the actual output of the ball mill. For the actual measurement, we take a simple weight measurement as an example, weigh a small iron drum of 1000 ml of water, and then we will Put the cement or raw material into it, tap it, smooth it, weigh it, then pour it out, fill it with water and weigh it again, then...