跳至主要内容

Scrap Tire Shredder Wear Parts

Contact Person:Mr.Zhao 0086-13523465141
scrap tire shredder, which comes in many different variations and sizes, is a machine used for reducing the size of scrap tire. 
 
Scrap Tire Shredder Wear Parts Include
 
Hammers: The most-frequently replaced wear part is the bell-shaped hammer. Hammers impart the enormous kinetic energy of a shredder’s spinning rotor onto the tire being shredded. Hammers weigh nearly one-half ton new and number about a dozen on the rotor. The rotor with hammers and other wear parts collectively weighs as much as 60 tons. A motor as large as 10,000 hp is needed to attain an operating speed of about 500 rpm. In general, hammers need to be replaced when they have worn down to less than half of their initial weight. If only one hammer needs to be replaced, operators typically replace the opposite hammer, too, to keep the rotor in balance. On average, hammers are replaced once a day.
 
Liners (including side liners and main liners): Liners internally protect the shredder from damage by the metal being shredded in the hammermill. Liners sustain substantial abrasion and impacts from the rapidly moving metal inside the hammermill. Depending on shredder size and material being shredded, liners may need replacing after 100,000-200,000 tons of material have passed through the shredder.
 
Caps (rotor and end discs): Rotor and end disc caps protect the rotor from damage by the tire being shredded in the hammermill. Depending on shredder size, caps can weight hundreds of pounds. Caps are replaced after about 10-15 hammer replacements, or about every 2-3 weeks of operations.

评论

此博客中的热门博文

What if the plastic shredder is blocked

Plastic shredder is specially designed to tear up plastics, building templates, wooden pallets and other waste wood, long time to tear up the work, there may be some problems. For example, in the process of production, fast feed, plastic shredder suddenly appeared blocked, what to do? Plastic shredder, congestion is more common problems are basically caused by not timely maintenance, regular cleaning, accumulate over a long period, can jam during production, not only affect the production, can also harm the plastic shredder. This is the reason why the plastic shredder is blocked. Plastic shredder failure requires you to pay attention to in time, if it is found that the shredding machine production, and the same raw material, check the damper is in place and pipes with and without air leakage, etc., the shredding machine jams are common faults, the possibility is there are four: 1: may be the body design problem; 2: the raw material is put in too fast; 3: it is the pipe of the discharg...

Scrap metal shredder

Start up and operation steps of dual shaft shredder

The industrial shredder expert explains the steps of starting the dual shaft shredder: 1. The starting motor of the dual shaft shredder operates under no load. If the technical conditions of each part are normal, it can only operate under load after the rotating speed is normal. 2. During the operation of the dual shaft shredder, there shall be no magnetic jamming and friction sound. 3. The screen shall be installed firmly, sealed, without leakage, and the screen frame shall be fixed tightly. 4. In case of abnormal noise, blocked discharge, overheated bearing or motor during the operation of the dual shaft shredder, stop feeding, stop inspection and troubleshooting. 5. At the end of the work, the crusher and fan can be stopped only after the materials in the machine are completely removed. 6. Safety production must be strictly guaranteed during operation. Do not increase the speed of the dual shaft shredder at will. Check the cotter pin on the pin shaft frequently. If it is excessivel...