跳至主要内容

Maintenance Cycle of Calcium Carbonate Grinding Mill

Calcium carbonate grinding mill with the vertical cylinder body,it can save more space and have the lower power consumption. Well,for a calcium carbonate grinding mill , how long is the maintenance period to be reasonable? 

1.Whether the socket and plug are loose, whether the foundation bolts are loose, the equipment vibration condition, the motor running situation, the oil pipe temperature and so on, these items need to be checked daily. If there is any abnormality, solve it in time.

2.The lubricating device of calcium carbonate grinding mill is divided into two kinds: One needs to be added the colloid grease, the other needs to be added the liquid engine oil. Two different lubrication ways need the different maintenance cycle. If the user uses the colloid grease to lubricate the calcium carbonate grinding mill, he should be sure to add the lubricating oil every two months. If using the liquid engine oil, the lubricating oil should be added once in four months.
 
3.The wear pattern of calcium carbonate grinding mill cylinder liner plate, the replacement of elastic rubber ring, the running condition of the different size gears, oil pump and lubrication tube, these devices need to have the maintenance, cleaning or replacement each month according to their different situations.

评论

此博客中的热门博文

How to Avoid Faults in Aluminum shredder

The main purpose of scrap  aluminum shredder  equipment is to tear all kinds of unqualified scrap iron into smaller pieces for recycling. Reduce the volume of unprocessed raw materials for mixing with other materials. How to avoid equipment failure in daily production of scrap aluminum shredder equipment?   1. Check and clean in time. After work every day, the machine should be cleaned in time. Check screw loosening and abrasion of easily worn parts such as claws, sieves, etc. http://www.sg-shredder.com/News/Industry_News/755.html

What if the plastic shredder is blocked

Plastic shredder is specially designed to tear up plastics, building templates, wooden pallets and other waste wood, long time to tear up the work, there may be some problems. For example, in the process of production, fast feed, plastic shredder suddenly appeared blocked, what to do? Plastic shredder, congestion is more common problems are basically caused by not timely maintenance, regular cleaning, accumulate over a long period, can jam during production, not only affect the production, can also harm the plastic shredder. This is the reason why the plastic shredder is blocked. Plastic shredder failure requires you to pay attention to in time, if it is found that the shredding machine production, and the same raw material, check the damper is in place and pipes with and without air leakage, etc., the shredding machine jams are common faults, the possibility is there are four: 1: may be the body design problem; 2: the raw material is put in too fast; 3: it is the pipe of the discharg...

Scrap metal shredder