跳至主要内容

Three main parts of aluminium shredder

The main parts and components of aluminium shredder are the focus of daily maintenance and repair. Now we know the common problems and maintenance schemes of the three main parts of aluminium shredder.
 
1. Fracture treatment of hammer head assembly of aluminium shredder
Hammer Head: The material with better impact resistance and abrasion resistance is used to toughen the hammer head with water to eliminate internal stress, increase the size of the hammer head, and increase the wall thickness of the fragile side walls, so as to improve the impact resistance of the hammer head.
Hammer shank: Choose 35 steel bar with good impact performance, forge and process, normalize, eliminate internal stress, increase the shape size of the hammer shank, improve the impact resistance of the hammer shank, and increase the shoulder size of the hammer shank to enhance the buffer capacity.

评论

此博客中的热门博文

What if the plastic shredder is blocked

Plastic shredder is specially designed to tear up plastics, building templates, wooden pallets and other waste wood, long time to tear up the work, there may be some problems. For example, in the process of production, fast feed, plastic shredder suddenly appeared blocked, what to do? Plastic shredder, congestion is more common problems are basically caused by not timely maintenance, regular cleaning, accumulate over a long period, can jam during production, not only affect the production, can also harm the plastic shredder. This is the reason why the plastic shredder is blocked. Plastic shredder failure requires you to pay attention to in time, if it is found that the shredding machine production, and the same raw material, check the damper is in place and pipes with and without air leakage, etc., the shredding machine jams are common faults, the possibility is there are four: 1: may be the body design problem; 2: the raw material is put in too fast; 3: it is the pipe of the discharg...

Scrap metal shredder

Start up and operation steps of dual shaft shredder

The industrial shredder expert explains the steps of starting the dual shaft shredder: 1. The starting motor of the dual shaft shredder operates under no load. If the technical conditions of each part are normal, it can only operate under load after the rotating speed is normal. 2. During the operation of the dual shaft shredder, there shall be no magnetic jamming and friction sound. 3. The screen shall be installed firmly, sealed, without leakage, and the screen frame shall be fixed tightly. 4. In case of abnormal noise, blocked discharge, overheated bearing or motor during the operation of the dual shaft shredder, stop feeding, stop inspection and troubleshooting. 5. At the end of the work, the crusher and fan can be stopped only after the materials in the machine are completely removed. 6. Safety production must be strictly guaranteed during operation. Do not increase the speed of the dual shaft shredder at will. Check the cotter pin on the pin shaft frequently. If it is excessivel...