跳至主要内容

Tips for dual shaft shredder equipment operation

In the process of the dual shaft shredder, we can use some tips to make the dual shaft shredder work more efficiently, quickly and safely.
 
1. Choose the same kind of materials as much as possible. For example, if we shred wood, we will always shred the wood, and the cans will always be shredded. This can ensure the working effect of the dual sahft shredder, and the shredded products are more uniform, and at the same time It also protects the dual shaft shredder.
 
2. The dual shaft shredder is pre-heated and idling before start-up. Many people ignore this small detail, but it turns out that the dual shaft shredder is idly pre-heated before working can greatly improve its working state and service life.

评论

此博客中的热门博文

What if the plastic shredder is blocked

Plastic shredder is specially designed to tear up plastics, building templates, wooden pallets and other waste wood, long time to tear up the work, there may be some problems. For example, in the process of production, fast feed, plastic shredder suddenly appeared blocked, what to do? Plastic shredder, congestion is more common problems are basically caused by not timely maintenance, regular cleaning, accumulate over a long period, can jam during production, not only affect the production, can also harm the plastic shredder. This is the reason why the plastic shredder is blocked. Plastic shredder failure requires you to pay attention to in time, if it is found that the shredding machine production, and the same raw material, check the damper is in place and pipes with and without air leakage, etc., the shredding machine jams are common faults, the possibility is there are four: 1: may be the body design problem; 2: the raw material is put in too fast; 3: it is the pipe of the discharg...

Scrap metal shredder

Start up and operation steps of dual shaft shredder

The industrial shredder expert explains the steps of starting the dual shaft shredder: 1. The starting motor of the dual shaft shredder operates under no load. If the technical conditions of each part are normal, it can only operate under load after the rotating speed is normal. 2. During the operation of the dual shaft shredder, there shall be no magnetic jamming and friction sound. 3. The screen shall be installed firmly, sealed, without leakage, and the screen frame shall be fixed tightly. 4. In case of abnormal noise, blocked discharge, overheated bearing or motor during the operation of the dual shaft shredder, stop feeding, stop inspection and troubleshooting. 5. At the end of the work, the crusher and fan can be stopped only after the materials in the machine are completely removed. 6. Safety production must be strictly guaranteed during operation. Do not increase the speed of the dual shaft shredder at will. Check the cotter pin on the pin shaft frequently. If it is excessivel...