跳至主要内容

Daily maintenance methods of metal shredder

The use and promotion of metal shredder in recent two years has been expanding. With the increase of users, the equipment has become a kind of equipment often mentioned in environmental protection equipment. Facing the vast number of users, we will tell you some methods of equipment maintenance, which can effectively bring some benefits to the working efficiency of the equipment, but also reduce some customers Unnecessary loss.

Metal shredder in factory

Daily maintenance method of metal shredder

1. Before starting the metal shredder, it is necessary to strictly check whether the installation of all parts is reasonable and whether the bolts are loose, and gently pull the belt by hand for test run. The purpose of the test run is to see if there is a cartridge case collision. At the same time, we need to check the direction of rotation. For safety production, do not break inflammable and explosive materials.

2. In the process of production, cutting should be kept even to ensure the crushing quality and smooth production. In order to ensure normal operation of shredder, overload of shredder motor is strictly prohibited.

3. At ordinary times, it is not only necessary to check the tightness and looseness of each part, but also to check which parts are easy to be damaged. If the wear is serious, we should replace the parts in time.

4. Because the speed of the metal shredder is very high, in addition to the firm installation, it should also maintain good lubrication, always check to ensure the normal operation of the equipment. In the process of using the shredder,the temperature of shredder bearing shall not exceed 70 ℃. Add grease and high-speed grease to the main bearing of shredder once a week. Oil will be better, and molybdenum disulfide.

We know that the shredder is generally equipped with two motors and two reducers. The reducers are mainly used to bear the impact damage of materials on the bearings during the tearing process of two shafts, which can reduce the damage to the auxiliary equipment of the motor. The second function is to adjust the speed. According to the fixed speed of the motor, the operation of the equipment can be controlled. The reducers are also calculated as the price excluding the shredder blades One of the higher accessories, so we need to carry out regular maintenance work on the reducer to avoid damage.

As a professional shredder manufacturer and supplier, Shuguang Heavy Machinery's double shaft shredder can shred common domestic waste, and has a special production line to treat waste tires into small particles, which are used as raw materials in many fields.Welcome to contact us for more details.
 
Factory Address: Longjiang West Road, Shangjie District, Zhengzhou City
Contact number: +86-371-67666660 676667
Mobile phone: 0086 13523465141
After-sales Service Department: 0371-67666667

评论

此博客中的热门博文

Waste tire recycling line

Method of calculating cement ball mill capacity

Cement ball mill  is commonly used crushing equipment in the industry ,the statistics on the output of the ball mill in actual production is an important basis for the report-type statistics of the production workshop. The data is mainly the statistics of the production of different shifts and the output of the ball mill, and we usually calculate the capacity of the mill. The basic methods are: the measuring method, the feeding weight measurement method, and the estimation of the output per ton of grinding body. Below, Dawning introduces you to the calculation of the specific yield of different methods. 1. Volume method The bin method is one of the easiest methods for calculating the actual output of the ball mill. For the actual measurement, we take a simple weight measurement as an example, weigh a small iron drum of 1000 ml of water, and then we will Put the cement or raw material into it, tap it, smooth it, weigh it, then pour it out, fill it with water and weigh it again, then...