跳至主要内容

How to increase the service life of dual shaft shredder blades

As an important part of the dual shaft shredder equipment, the service life of the cutter directly affects the performance of the shredder equipment. According to the different materials torn by the shredder equipment, the shredder blades has different shapes and structures. Dual shaft shredder equipment is widely used for shredding wood, PE pipe, plastic bottle, waste copper wire, plastic film, woven bag, paper, circuit board, light and thin metal, medical supplies, waste household appliances, vehicle recycling, domestic waste treatment.


How to increase the life of shredder blade
1. When installing the shredder blade, the nut must be tightened properly. If the blade is too loose, it will slide during rotary cutting. If the blade is too tight, internal damage or deformation will affect the cutting effect.

2. Regularly check the radial runout of the main shaft of the machine, and ensure that the cutter blades of the shredder coincide with each other.

3. Before cutting the shredder blade, the operator must wear protective equipment to check whether the saw protective cover is in good condition.

4. After the installation is stable, the blade of the double shaft shredder shall be idle for 30 seconds, and the cutting shall be started after everything is normal.

5. The alloy cutter head of the dual shaft shredder has a sharp and sensitive blade. Therefore, care must be taken to protect the alloy cutter head from damage during moving, installing and removing the blade.

6. Before installing the shredder blade, the debris on the spindle and flange must be removed. The flange face shall be flat and clean and intersect the shaft vertically.

What are the main factors that affect the service life of shredder tools?
1. The structure of the tool: the cutting clearance between the tools, the angle of the tool, the surface roughness of the tool edge;

2. Raw materials of cutting tools: the content of beneficial alloy elements and harmful alloy elements;

3. Heat treatment of cutter: hardness of cutter and uniformity of hardness on the same surface;

4. Tool rotation speed: the tearing speed of the tool relative to the material;

5. Tearing force of cutter: that is, the power of tearing machine equipment.

As a professional shredder manufacturer and supplier, Shuguang Heavy Machinery's double shaft shredder can shred common domestic waste, and has a special production line to treat waste tires into small particles, which are used as raw materials in many fields.Welcome to contact us for more details.
 
Factory Address: Longjiang West Road, Shangjie District, Zhengzhou City
Contact number: +86-371-67666660 676667
Mobile phone: 0086 13523465141
After-sales Service Department: 0371-67666667

评论

此博客中的热门博文

What if the plastic shredder is blocked

Plastic shredder is specially designed to tear up plastics, building templates, wooden pallets and other waste wood, long time to tear up the work, there may be some problems. For example, in the process of production, fast feed, plastic shredder suddenly appeared blocked, what to do? Plastic shredder, congestion is more common problems are basically caused by not timely maintenance, regular cleaning, accumulate over a long period, can jam during production, not only affect the production, can also harm the plastic shredder. This is the reason why the plastic shredder is blocked. Plastic shredder failure requires you to pay attention to in time, if it is found that the shredding machine production, and the same raw material, check the damper is in place and pipes with and without air leakage, etc., the shredding machine jams are common faults, the possibility is there are four: 1: may be the body design problem; 2: the raw material is put in too fast; 3: it is the pipe of the discharg...

Scrap metal shredder

Start up and operation steps of dual shaft shredder

The industrial shredder expert explains the steps of starting the dual shaft shredder: 1. The starting motor of the dual shaft shredder operates under no load. If the technical conditions of each part are normal, it can only operate under load after the rotating speed is normal. 2. During the operation of the dual shaft shredder, there shall be no magnetic jamming and friction sound. 3. The screen shall be installed firmly, sealed, without leakage, and the screen frame shall be fixed tightly. 4. In case of abnormal noise, blocked discharge, overheated bearing or motor during the operation of the dual shaft shredder, stop feeding, stop inspection and troubleshooting. 5. At the end of the work, the crusher and fan can be stopped only after the materials in the machine are completely removed. 6. Safety production must be strictly guaranteed during operation. Do not increase the speed of the dual shaft shredder at will. Check the cotter pin on the pin shaft frequently. If it is excessivel...