跳至主要内容

How long is the service life of metal shredder blade

Blade is an essential part of metal shredder. As a manufacturer with a history of 30 years, our metal shredder is equipped with high-quality wear-resistant blades, so as to ensure that the metal shredder products can tear various materials. In addition, the metal shredder blade is a vulnerable part, so many metal shredder users want to know how long the service life of metal shredder blade?

Generally speaking, the service life of metal shredder blades is about half a year, and the number of blades equipped with metal shredder models is also different. This is why there is an obvious gap in the output of metal shredders. In addition, Dawning's metal shredder blades are all made of relatively good metal materials, with good wear-resistant crushing effect. In the later use process, it can be used to crush various materials.

Good metal shredder blades need maintenance and maintenance, no matter it is any metal shredder blade if not maintained, it will wear very seriously. Therefore, in the later use, we should regularly observe the wear degree of the metal shredder blade, especially the large metal shredder not only tears a lot of materials, but also has a long working period. Therefore, in order not to affect the quality of the metal shredder products, it is necessary to regularly observe the wear degree of the blade. If there is no use value, it is recommended to replace the metal shredder blade as soon as possible.

In addition to regular maintenance and maintenance of metal shredder blades, we do not recommend that metal shredder users often crush these materials. Because if these materials are crushed for a long time, it will speed up the damage of metal shredder blades. For moisture containing materials, all materials that can be crushed by metal shredder are dry materials. However, some users may crush some materials with moisture for various reasons. During the crushing process of metal shredder, the blade will be corroded due to moisture. In addition, the long-time crushing will also affect the internal cleaning of the metal shredder.

As a professional shredder manufacturer and supplier, Shuguang Heavy Machinery's double shaft shredder can shred common domestic waste, and has a special production line to treat waste tires into small particles, which are used as raw materials in many fields.Welcome to contact us for more details.
 
Factory Address: Longjiang West Road, Shangjie District, Zhengzhou City
Contact number: +86-371-67666660 676667
Mobile phone: 0086 13523465141
After-sales Service Department: 0371-67666667

评论

此博客中的热门博文

What if the plastic shredder is blocked

Plastic shredder is specially designed to tear up plastics, building templates, wooden pallets and other waste wood, long time to tear up the work, there may be some problems. For example, in the process of production, fast feed, plastic shredder suddenly appeared blocked, what to do? Plastic shredder, congestion is more common problems are basically caused by not timely maintenance, regular cleaning, accumulate over a long period, can jam during production, not only affect the production, can also harm the plastic shredder. This is the reason why the plastic shredder is blocked. Plastic shredder failure requires you to pay attention to in time, if it is found that the shredding machine production, and the same raw material, check the damper is in place and pipes with and without air leakage, etc., the shredding machine jams are common faults, the possibility is there are four: 1: may be the body design problem; 2: the raw material is put in too fast; 3: it is the pipe of the discharg...

Scrap metal shredder

Start up and operation steps of dual shaft shredder

The industrial shredder expert explains the steps of starting the dual shaft shredder: 1. The starting motor of the dual shaft shredder operates under no load. If the technical conditions of each part are normal, it can only operate under load after the rotating speed is normal. 2. During the operation of the dual shaft shredder, there shall be no magnetic jamming and friction sound. 3. The screen shall be installed firmly, sealed, without leakage, and the screen frame shall be fixed tightly. 4. In case of abnormal noise, blocked discharge, overheated bearing or motor during the operation of the dual shaft shredder, stop feeding, stop inspection and troubleshooting. 5. At the end of the work, the crusher and fan can be stopped only after the materials in the machine are completely removed. 6. Safety production must be strictly guaranteed during operation. Do not increase the speed of the dual shaft shredder at will. Check the cotter pin on the pin shaft frequently. If it is excessivel...