跳至主要内容

Voltage plays a key role in the normal operation of metal shredder

Metal shredder as a common shredding equipment, voltage plays a key role in its normal operation, so ensuring the stability of the supply voltage of the shredder is an important factor to ensure the stable production of the equipment. In the application of metal shredder, the user should eliminate the hidden danger that may damage the safety of the equipment. The voltage is one of the items that the user needs to check before the operation of the equipment. The voltage plays a key role in the normal work of the shredder.

Of course, there are many factors that affect the efficient operation of the metal shredder, some of which come from the equipment itself and some from the external environment. Their own factors can be changed through maintenance, while those from the outside are not easy to grasp because of the instability. Take the voltage of the metal shredder processing site as an example, it is easy to be ignored 。

The voltage is often one of the important factors that affect the efficiency of the shredder. Therefore, the shredder manufacturer has come up with a set of solutions to deal with such a situation: during the operation of the metal shredder, the voltmeter connected with the equipment will reflect the value of the power supply voltage in real time. When the pointer of the voltmeter is unstable, it means that the power supply voltage of the device is suddenly High and low, because the metal shredder has an additional power consumption value when it works. If the current value of voltage output does not reach the standard, the motor can not drive the shredder to work normally, so the equipment can not run normally. At this time, the conflict between metal shredder components will also increase, which shows that normal voltage is normal for metal shredder.

As a professional shredder manufacturer and supplier, Shuguang Heavy Machinery's double shaft shredder can shred common domestic waste, and has a special production line to treat waste tires into small particles, which are used as raw materials in many fields.Welcome to contact us for more details.
 
Factory Address: Longjiang West Road, Shangjie District, Zhengzhou City
Contact number: +86-371-67666660 676667
Mobile phone: 0086 13523465141
After-sales Service Department: 0371-67666667

评论

此博客中的热门博文

What if the plastic shredder is blocked

Plastic shredder is specially designed to tear up plastics, building templates, wooden pallets and other waste wood, long time to tear up the work, there may be some problems. For example, in the process of production, fast feed, plastic shredder suddenly appeared blocked, what to do? Plastic shredder, congestion is more common problems are basically caused by not timely maintenance, regular cleaning, accumulate over a long period, can jam during production, not only affect the production, can also harm the plastic shredder. This is the reason why the plastic shredder is blocked. Plastic shredder failure requires you to pay attention to in time, if it is found that the shredding machine production, and the same raw material, check the damper is in place and pipes with and without air leakage, etc., the shredding machine jams are common faults, the possibility is there are four: 1: may be the body design problem; 2: the raw material is put in too fast; 3: it is the pipe of the discharg...

Scrap metal shredder

Start up and operation steps of dual shaft shredder

The industrial shredder expert explains the steps of starting the dual shaft shredder: 1. The starting motor of the dual shaft shredder operates under no load. If the technical conditions of each part are normal, it can only operate under load after the rotating speed is normal. 2. During the operation of the dual shaft shredder, there shall be no magnetic jamming and friction sound. 3. The screen shall be installed firmly, sealed, without leakage, and the screen frame shall be fixed tightly. 4. In case of abnormal noise, blocked discharge, overheated bearing or motor during the operation of the dual shaft shredder, stop feeding, stop inspection and troubleshooting. 5. At the end of the work, the crusher and fan can be stopped only after the materials in the machine are completely removed. 6. Safety production must be strictly guaranteed during operation. Do not increase the speed of the dual shaft shredder at will. Check the cotter pin on the pin shaft frequently. If it is excessivel...